Press Release Navigation

<<< Previous

Headlines

Next >>>


NEWS RELEASE TRANSMITTED BY Marketwire

FOR: PAN ORIENT ENERGY CORP.

TSX VENTURE SYMBOL: POE - | View Quote |  View Chart |  View Financials | 

Pan Orient Energy Corp.: Thailand NS-4 Test Results

Jun 04, 2007 - 06:30 ET

CALGARY, ALBERTA--(Marketwire - June 4, 2007) - Pan Orient Energy Corp. (TSX VENTURE:POE)

NOT FOR DISSEMINATION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.

Na Sanun-4 ("NS-4") is on production at a stabilised rate of approximately 686 bbl/d of 29.9 degree API crude with a GOR of 100-150 scf/bbl and 0.1% water cut. NS-4 reached a peak rate of 950 bbl/d that stabilised at 780 bbl/d prior to being restricted. The current 686 bbl/d rate is on choke settings of 10/64" on the annulus and 24/64" on the tubing. Flowing casing head pressure is 285 psi and flowing tubing head pressure is 80 psi. There has been little recovery of the more than 3,400 barrels of drilling fluid that was lost to the formation during drilling operations.

NS-4 penetrated the top 39 meters of the first target volcanic reservoir interval at a depth of approximately 952 meters. Severe lost circulation in the upper portion of the first target volcanic zone necessitated early termination of drilling prior to evaluating at least four deeper volcanic targets. The most recent Gaffney Cline and Associates 2006 year end Thailand reserve report attributed no reserve volumes of any category to the Na Sanun structure.

The Aztec #7 rig has moved off location and is currently drilling ahead on the next well, NS-1RD, approximately 800 meters north of NS-4 and within the same fault compartment. Drilling is anticipated to take 10-12 days to completion. Based on the exceptional results from NS-4, the joint venture is considering adding two more Na Sanun appraisal locations that would be in addition to the 5 initially planned and scheduled. A second Aztec rig is anticipated to commence drilling operations in approximately two to three weeks with mobilisation starting this week from northeast Thailand.

Pan Orient CEO Jeff Chisholm states: "NS-4 is the best well we have drilled in the L44 concession to date, and the production rates announced today are exceptional for a shallow onshore well drilled and completed with a "slim hole" design. We have evaluated only one of the five potential volcanic zones within the Na Sanun structural closure and have yet to start appraisal drilling on the Na Sanun East (POE-9) discovery made earlier this year. 2007 is an active year with a remaining 25 well drilling program just underway and two 3D seismic surveys, the first of which starts acquisition shortly. In addition, Pan Orient is actively pursuing new venture opportunities within the focus areas of Thailand, Indonesia, India and China."

Pan Orient has also released it financial statements and management's discussion and analysis for its first quarter ended March 31, 2007, which can be found online at www.sedar.com.

Pan Orient is a Calgary, Alberta based oil and gas exploration and production company with operations currently located onshore Thailand and in Western Canada.

This news release contains forward-looking information. Forward-looking information is generally identifiable by the terminology used, such as "expect", "believe", "estimate", "should", "anticipate" and "potential" or other similar wording. Forward-looking information in this news release includes, but is not limited to, references to: well drilling programs and drilling plans, estimates of reserves and potentially recoverable resources, and information on future production and project start-ups. By their very nature, the forward-looking statements contained in this news release require Pan Orient and its management to make assumptions that may not materialize or that may not be accurate. The forward-looking information contained in this news release is subject to known and unknown risks and uncertainties and other factors, which could cause actual results, expectations, achievements or performance to differ materially, including without limitation: imprecision of reserve estimates and estimates of recoverable quantities of oil, changes in project schedules, operating and reservoir performance, the effects of weather and climate change, the results of exploration and development drilling and related activities, demand for oil and gas, commercial negotiations, other technical and economic factors or revisions and other factors, many of which are beyond the control of Pan Orient. Although Pan Orient believes that the expectations reflected in its forward-looking statements are reasonable, it can give no assurances that the expectations of any forward-looking statements will prove to be correct.

40,134,842 common shares issued




The TSX Venture Exchange has neither approved nor disapproved the contents of this press release. The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Pan Orient Energy Corp.
Jeff Chisholm
President and CEO
(403) 294-1770

or

Pan Orient Energy Corp.
Jason Bednar
Vice President Finance and CFO
(403) 294-1770
Email: jason@panorient.ca